Baumit Alpha 2000, 25 kg – Self-Levelling Screed for Interior Floors and Underfloor Heating
Baumit Alpha 2000 is a calcium sulphate screed used to create a flat floor layer before installing the floor covering. It is designed primarily for machine application and is suitable for large indoor areas. It can be installed as a bonded screed at a minimum thickness of 25 mm or a floating screed at a minimum thickness of 35 mm.
In water-based underfloor heating systems, the flowing mix surrounds the pipes and makes good contact with them. This helps transfer heat from the pipes into the screed. The formulation requires no additional admixtures for this application.
When to Use Baumit Alpha 2000
- As a bonded screed – when the screed is laid directly onto a sound, prepared and primed substrate.
- As a floating screed – when the screed is laid over insulation and isolated from the walls. The thickness must also account for the specified floor loading.
- With underfloor heating – when the screed must surround the pipes and provide the specified cover above them.
- On large indoor floors – where machine mixing and pumping help lay the screed progressively to the specified level.
The product is intended for interior rooms without prolonged exposure to moisture. Swimming pools, areas with high moisture exposure and areas classified W4 or W5 under ÖNORM B 2207 are outside its scope of use.
Technical Specifications
| Property | Value |
| Bag size | 25 kg |
| Binder type | Calcium sulphate |
| Classification under BDS EN 13813 | CA-C20-F5 |
| Compressive strength | Greater than 20 N/mm² |
| Flexural strength | Greater than 5 N/mm² |
| Dry density | Approximately 1,950 kg/m³ |
| Maximum grain size | 4 mm |
| Minimum bonded screed thickness | 25 mm |
| Minimum floating screed thickness | 35 mm |
| Minimum cover above heating pipes | 25–30 mm according to the technical data sheet |
| Approximate consumption | 18.5–19 kg/m² per centimetre of thickness |
| Approximate water requirement | 6.4 L per 25 kg bag |
| Temperature during application and setting | Above +5 °C and up to +30 °C for the air, substrate and material |
| Pallet quantity | 48 bags, 1,200 kg total |
| Storage | 6 months in dry conditions, on wooden supports and under protective wrapping |
How Many Bags Do You Need?
Measure the floor area and calculate the average screed thickness in centimetres. For estimating, multiply the area by the thickness and by 19 kg/m²/cm. Add approximately 10% as an allowance, divide by 25 kg and round up to a whole bag. On uneven floors, check the thickness at several points, including the highest point of the substrate, where the screed will be thinnest.
| Average thickness |
Consumption per m² at 19 kg/m²/cm |
Coverage per bag before allowance |
| 25 mm | 47.5 kg | Approx. 0.53 m² |
| 35 mm | 66.5 kg | Approx. 0.38 m² |
| 45 mm | 85.5 kg | Approx. 0.29 m² |
| 50 mm | 95 kg | Approx. 0.26 m² |
Example for a 20 m² floor with an average screed thickness of 35 mm. At 19 kg/m²/cm, the estimated requirement is 1,330 kg. With a 10% allowance, this rises to 1,463 kg, equivalent to 59 bags of 25 kg. For underfloor heating, base the estimate on the total design thickness of the screed. Pipe cover is measured separately from the top of the pipes.
Substrate Preparation
Check the substrate for strength, flatness and moisture content. For a bonded screed, remove loose material, hardened cement laitance and salt deposits. Apply Baumit Grund to absorbent substrates or Baumit SuperPrimer to low-absorbency and non-absorbent substrates.
For a floating screed, PVC sheeting is commonly used as a separating layer. Isolate the screed from adjoining walls with a perimeter strip, for example 5–10 mm thick. Before pouring, mark the screed level and check that the remaining floor height accommodates the covering and any specified adhesive or underlay.
Mixing and Application
- Set up the equipment. Machine application requires a suitable silo pump or a plastering machine fitted with a secondary mixer and a hose for the mixed screed. For small rooms of approximately 10–15 m² or less, Baumit also allows the use of a gravity mixer.
- Set the water feed. Use clean mains water. The indicative amount is 6.4 L per 25 kg bag. During machine application, adjust the supply to suit the equipment and achieve the required consistency. Do not add other products to the mix.
- Pour to the specified level. After pouring, work the fresh screed with a tubular dappling bar. Make three passes with a light dappling action, alternating the direction at right angles.
- Protect the fresh screed. Keep the screed out of direct sunlight and draughts during the first 24 hours. Once it has set and gained sufficient strength, after at least 24 hours, ventilate the room thoroughly to help it dry.
Foot Traffic and Readiness for Floor Coverings
As a guide, the screed can be walked on after approximately one day, can take partial loading after two days and can take full loading after approximately five days. Before installing a floor covering, check the residual moisture using the calcium carbide method (CM test). Thicker screeds, low temperatures and high humidity can extend drying times considerably.
For coverings with low or negligible water vapour permeability, including large-format tiles, the technical data sheet specifies below 0.5% residual moisture without underfloor heating and below 0.3% with underfloor heating. Before installation, vacuum the surface and select a primer suited to the covering. If using a levelling compound or a rapid-setting cement-based adhesive, confirm with its manufacturer that it is compatible with calcium sulphate substrates.
Installation over Underfloor Heating
Provide a minimum cover of 25–30 mm above the pipes as specified in the technical data sheet and follow the floor system design for the total screed thickness. Plan the initial heat-up in accordance with Baumit's instructions, which specify a minimum waiting period of 3–5 days after application. In unfavourable conditions between +5 °C and +15 °C, the start may need to be delayed to suit site conditions.
Keep a record of the heating cycle and complete it before installing the floor covering. The technical data sheet specifies a starting flow temperature of at least +15 °C, followed by an increase of 5 °C every 24 hours until the design operating temperature is reached, typically +35 °C to +40 °C. Maintain that temperature for at least 11 days, then lower it gradually to room temperature over approximately two days.